Our Process
Remanufacturing is the process of disassembly of products during which time parts are cleaned, repaired or replaced then reassembled to sound working condition.
There is quite a difference between remanufacturing and reconditioning a piece of equipment. Our list below references the most common points of differentiation between reconditioning and remanfacturing in our shop.
| Remanufactured | Reconditioned | |
|---|---|---|
| Frame Cleaned | ![]() |
![]() |
| Frame Sand Blasted | ![]() |
|
| Frame Inspected | ![]() |
![]() |
| New Frame Bearings | ![]() |
![]() |
| New Seals | ![]() |
![]() |
| New Gaskets & 0-Rings | ![]() |
(If Needed) |
| New or Recond. Cross Shaft | ![]() |
|
| New Drive Gears | (If Needed) |
|
| New or Recond. Spindle | (If Needed) |
|
| Paint Interior Casing | ![]() |
![]() |
| Polish External Parts | ![]() |
|
| Paint External Parts | ![]() |
|
| Recond. Pumps | ![]() |
|
| Rebuild Clutch | ![]() |
|
| New Gauges | ![]() |
|
| New or Reconditioned Insertion Tools | ![]() |
|
| Bowl Cleaned | ![]() |
![]() |
| Bowl Inspected for Erosion | ![]() |
![]() |
| Dye Penetration Testing | ![]() |
|
| Disc Condition Inspected | ![]() |
![]() |
| Thread Wear Inspected | ![]() |
|
| Bowl Refinishing | ![]() |
|
| Bowl Polishing | ![]() |
|
| New Bowl Gaskets | ![]() |
(If Needed) |
| New Bowl Springs & Valve Plugs | ![]() |
![]() |
| Bowl Tolerances Checked | ![]() |
|
| Correct Number of Discs Checked | ![]() |
|
| Correct Disc Spacers Checked | ![]() |
|
| Correct RC Location Checked | ![]() |
|
| Bowl Run In and Computer Balanced | ![]() |
|
| New Motor Bearings | ![]() |
|
| True Motor Shaft | ![]() |
|
| Fresh Paint on Motor | ![]() |
![]() |
| Motor Tested for Proper Functioning | ![]() |
![]() |
| Removal of Old Controls | ![]() |
|
| New Control Panel | ![]() |
|
| Disc Height Checked | ![]() |
|
| Centripetal Pump Height Checked | ![]() |
|
| Critical Dimensions Checked | ![]() |
|
| Complete Final Testing | ![]() |
![]() |
| Run on Water to Check Functioning | ![]() |
|
| Run in for 8 - 10 Hours | ![]() |
|
| Final Inspection | ![]() |
![]() |
| Shipping | ![]() |
![]() |







(If Needed)